PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Backfill around L-5 Footing Facing North-East (800x600).jpg Formed Strip Footings at L-line between 3.3 - 4 Facing North East  (800x600)0.jpg Rebar mats at Elev. 1,2,3 Facing West (800x600).jpg Layout wall at Monumental Stair Facing South (800x600).jpg Layout wall at Monumental Stair Facing South -2 (800x600).jpg Building rebar cages at Elev. 1,2,3 Facing South-East (800x600).jpg Striped Slip form from Elev. 5-6 Facing South-West (800x600).jpg Building rebar cages at Elev. 1,2,3 Facing East (800x600).jpg Layout wall at Monumental Stair Facing East (800x600).jpg
Previous pageNext page Layout wall at Monumental Stair Facing South -2 (800x600)
Layout wall at Monumental Stair Facing South -2 (800x600)